Intelligence Infrastructure

Operational Intelligence for Construction and Trades

We build your intelligence department.

We map your operation, find where margin disappears, and install the dashboards, workflows, and agents that give leadership real visibility.

Executive Dashboard
LIVE

Active Jobs

14

+2

Avg Margin

23.4%

-1.2%

Backlog

$4.8M

+$620K

Billing Lag

6 days

-3 days

JobPMMarginStatusBilled
Apex Tower MEPR. Torres28.1%on-track
72%
Civic Center HVACK. Pham14.3%at-risk
48%
Ridgeline Phase 2D. Walsh31.7%on-track
91%
Harbor ElectricalM. Chen9.8%critical
34%
West End PlumbingJ. Okafor26.5%on-track
67%

Built for construction and trades · 20–200+ employees · PM-heavy operations · fragmented reporting · field-to-office visibility gaps

Specialty ContractorsSelf-Performing GCsMechanical / HVACElectricalCivil / SiteField Service Trades

Where does the money go?

01

The Problem

Five places contractors lose money

Margin does not disappear all at once. It leaks in layers — between estimating, field execution, reporting, billing, and closeout.

01

Estimating Misses

Bids go out without feedback from the last ten jobs. Lessons stay in people’s heads. The same mistakes get priced in again.

02

Labor Visibility Gaps

Hours get logged but production context does not. Overages show up on payroll, not on job reports. By then it is too late.

03

Untracked Field Changes

Work happens. Scope shifts. The change never becomes a change order. Recoverable revenue stays on the table.

04

Reporting Lag

PMs build reports manually. Controllers close on stale job data. Owners rely on verbal updates. Nobody sees the same number.

05

Billing and Closeout Leakage

Billing packages lag behind production. Retention sits uncollected. Closeout drags. Cash flow pays the price.

Here's how we fix it.

It works.

03

Proof

Results from the field

Waste Identified

$1.2M

total identified

Recovered Year One

$1.3M

verified savings

Reporting Lag

18→3

days to close

PM Time Saved

73%

reporting hours

Specialty Contractor

$183K in annual waste identified in two weeks

Specialty mechanical contractor · 62 employees · $14.6M revenue

Result

$127K recovered in year one. PM reporting time reduced from 11.4 to 3.1 hours per week.

We knew margin was leaking but could never pinpoint where. The diagnostic laid out every gap with a dollar figure attached. The dashboards changed how we run weekly meetings.

MR

Mike R.

President · Specialty Mechanical Contractor

Your business needs an intelligence department.

Two to four weeks. Every gap gets a dollar figure. Every finding points to a system, workflow, or agent that can be installed. That is how it gets built.